Search Proceedings
Who we are
Virtual DMT: An Opportunity for Pile Design?
Gianni Togliani
-
Abstract:The DMT results are rarely used for piles design, probably because its diffusion and popularity are still limited although DMT is in use for a long time. Conversely CPTu are much more popular and often used to this purpose: this is the reason why a large concerned database is available where it is possible to get the CPTu/DMT conversion experienced in recent years. This was done for two well-documented cases [a bored pile in Santa Cruz (Bolivia) and a driven pipe pile in Sandpoint, (US)] with promising results.
-
Keywords:DMT, Pile, Capacity, Load, Movements
-
Download:
-
DOI:_unreg_tc4-GEO-2016.22
Event details:
-
IMEKO TC:TC4
-
Event name:TC4 International Workshop on Metrology for Geotechnics 2016
-
Title:
1st IMEKO TC4 International Workshop on Metrology for Geotechnics
-
Place:Benevento, ITALY
-
Time:17 March 2016 - 18 March 2016