Search Proceedings
Who we are
DEVELOPMENT OF A 15MN BUILD-UP-SYSTEM FOR CALIBRATIONS IN UKRAINES HEAVY INDUSTRY
Michael Wagner, Alexander Tsiporenko, Falk Tegtmeier
-
Abstract:This paper describes the constructional details of an FEM-supported construction of adaptation parts for a Build Up system up to 15 MN. After a short introduction about “Ukrmetrteststandard”, the NMI in Ukraine, several constructional details will be discussed which result in a very low measurement uncertainty. In addition, some experiences about the use of BU systems obtained during the evaluation will be presented.
-
Keywords:Ukrmetrteststandard, build-up system, mega-netwon range
-
Download:
-
DOI:_unreg_wc-2015.090
Event details:
-
IMEKO TC:
-
Event name:XXI IMEKO World Congress
-
Title:
Measurement in Research and Industry
-
Place:Prague, CZECH REPUBLIC
-
Time:30 August 2015 - 04 September 2015