Skip to main content

DEVELOPMENT OF A 15MN BUILD-UP-SYSTEM FOR CALIBRATIONS IN UKRAINES HEAVY INDUSTRY

Michael Wagner, Alexander Tsiporenko, Falk Tegtmeier
  • Abstract:
    This paper describes the constructional details of an FEM-supported construction of adaptation parts for a Build Up system up to 15 MN. After a short introduction about “Ukrmetrteststandard”, the NMI in Ukraine, several constructional details will be discussed which result in a very low measurement uncertainty. In addition, some experiences about the use of BU systems obtained during the evaluation will be presented.
  • Keywords:
    Ukrmetrteststandard, build-up system, mega-netwon range
  • DOI:
    _unreg_wc-2015.090

Event details:

  • IMEKO TC:
  • Event name:
    XXI IMEKO World Congress
  • Title:

    Measurement in Research and Industry

  • Place:
    Prague, CZECH REPUBLIC
  • Time:
    30 August 2015 - 04 September 2015