Search Proceedings
Who we are
A NEW ULTRASTABLE TRANSFER STANDARD FOR TCC’S NEW HIGH PRESSURE GAS METER CALIBRATION FACILITY
H. H. Dijstelbergen, H. Bellinga
-
Abstract:Tests are reported on a 10-unit Rotary Piston Prover system that is installed at the TCC high-pressure gas meter testing facility. The paper also describes new tests that were carried out with the Rotary Piston Prover concerning its temperature dependence. Tests against a Bell Prover are also reported.
-
Keywords:reference standards, gas meter calibration, meter proving, piston prover, high pressure gas meter testing
-
Download:
-
DOI:_unreg_tc9-2000.077
Event details:
-
IMEKO TC:TC9
-
Event name:FLOMEKO 2000
-
Title:10th Conference on Flow Measurement
-
Place:Salvador, Bahia, BRAZIL
-
Time:04 June 2000 - 08 June 2000