  • Abstract:
    Tests are reported on a 10-unit Rotary Piston Prover system that is installed at the TCC high-pressure gas meter testing facility. The paper also describes new tests that were carried out with the Rotary Piston Prover concerning its temperature dependence. Tests against a Bell Prover are also reported.
  • Keywords:
    reference standards, gas meter calibration, meter proving, piston prover, high pressure gas meter testing
  • DOI:
    _unreg_tc9-2000.077