Skip to main content

A FOUR TERMINAL-PAIR COAXIAL IMPEDANCE BRIDGE CONSTRUCTED AT INMETRO

Renata T. de Barros e Vasconcellos, Luiz Macoto Ogino
  • Abstract:
    This paper describes the final construction stage and preliminary measurements results of a low-frequency four terminal-pair coaxial impedance bridge, part of the traceability chain of the capacitance unit to the quantum Hall effect, constructed at Inmetro. The coaxial bridge is a complex system, with several technical advantages, as highstability and very low-uncertainty.
  • Keywords:
    Coaxial current bridges, electrical metrology, impedance measurements
  • DOI:
    _unreg_tc4-2011.023

Event details:

  • IMEKO TC:
    TC4
  • Event name:
    TC4 Symposium 2011
  • Title:

    XVIIIth IMEKO TC4 International Symposium on Measurement of Electrical Quantities (part of Metrologia2011, together with IX International Congress on Electrical Metrology - IX SEMETRO)

  • Place:
    Natal, BRAZIL
  • Time:
    27 September 2011 - 30 September 2011